Ice Storage System Expansion Study, Iolani School, Honolulu, Hawaii
Back to EducationWe provided the mechanical and electrical engineering work for evaluating the existing central plant and provided options for expanding and updating the overall air conditioning master plan.
Our scope of work include the following:
- Establish current air conditioning loads by monitoring the DDC systems serving the campus.
- Establish future loading requirements on the plant based on evaluation of the updated masterplan.
- Based on the analysis of the data, evaluate options for expansion of the plant and/or improvement.
- Provide cost estimates for recommended options.
- Summarize findings in the brief narrative report.
- Meet with school administrators to discuss study findings.