Kona Community Center

KONA, HAWAII

InSynergy Engineering, Inc. is currently providing mechanical, electrical, and fire protection engineering design for the following projects at Kona Community Hospital:

  • Adopt-A-Room Program:  Renovation of 15 patient rooms, including replacement of exisitng HVAC diffusers and registers; fire sprinkler heads; fan coil unit thermostat; plumbing fixtures; new water closet; reconnection of medical gases; replacement of lighting and receptacles; new fire alarm devices; nurse call devices; and new wall mounted flat screen televisions.
  • Cafeteria Hallway Modification: Conducting site survey and code check to ensure work conducted meets building code requirements; developing as-built drawings for building permit processing.
  • SSB Basement Modifications: Conducting site survey and code check to ensure work conducted meets building code requirements; developing as-built drawings for building permit processing.
  • Emergency Power System Phase 1 Assessment:  Determining the sizes of the emergency power supply systems and determining ways to reduce the load on the emergency power supply system
  • Fire Alarm System Upgrade:  Renovation of fire safety doors and update of the Life Safety drawings
  • NFPA 13 Phase 2:  Providing mechanical, electrical, and architectural design work for plumbing, medical gas, ventilation, air conditioning, fire protection, power, and lighting.
  • Pharmacy Remodel:  Mechanical and electrical engineering design work to renovate the existing pharmacy area on the first floor of the main hospital building.  Design work includes removing and replacing existing ductwork; plumbing fixtures; exhaust system; fire sprinkler heads; and existing duct shaft.  Electrical scope includes removing exisitng receptacles, lights, and telecommunications; providing new lighting; receptacles and data outlets; new telephone outlets and Network LAN drops; and new fire alarm devices.

 

[back to Portfolio: Healthcare]