Quad C, E, F Renovations, Schofield Barracks

Design Build for WBR Brigade Complex, Quads C, E, and F

SCHOFIELD BARRACKS, HAWAII

InSynergy Engineering, Inc. provided the mechanical, electrical and fire protection design for three separate quad projects for the US Army at Schofield Barracks.  Each quad consists of four 60,000 sf buildings that are used to support Army Company Operations and Brigade Headquarters, including two-man barracks dormitories, administrative spaces, kitchen and dining room facilities, classrooms, and miscellaneous storage areas.

The mechanical design included complete air conditioning replacement including a new central chiller plant for each quad with underground chilled water distribution to each building, a new central hot water heating system utilizing heat recovery from the new central chiller plant, plumbing systems including domestic water booster pump system, grease interceptor systems, and LPG distribution, dehumidification control for the arms vaults.  The fire protection design included a new fire pump, fire sprinkler, fire alarm and AT/FP measures including mass notification systems for each building.

The electrical design work included exterior and interior power distribution, site and interior lighting, telephone, data, and CATV systems.

 

 

[back to Portfolio: Federal]